全自动Dielectric Loss Tester-扬州达瑞

HBR-24 Stainless Steel Explosion-Proof Heater

Published: 2026-10-19

产品价格:0.00

Views: 2922

Category: Electric Heating II

Product Description

During on-site inspections, if the explosion-proof wiring cavity is found to have elevated temperatures, the housing paint is discolored, or condensation is present on sealing surfaces, it often indicates that the heater has been operating long-term under conditions approaching the upper limit of its temperature group, and the selection and installation parameters need to be re-verified. The following lists the engineering parameters of the HBR-24 stainless steel explosion-proof heater by key points for on-site O&M personnel to check against.

Explosion-Proof Parameters and Applicable Locations

The explosion-proof marking is Exd IIB T4 Gb, suitable for locations where Class IIB, T4 temperature group flammable gases are present. The flameproof enclosure and wiring cavity are independently sealed; the entry device is selected according to the cable outer diameter, and after installation it should be confirmed that the flameproof surface gap and fastener torque meet the requirements of the factory documents.

Electrical Parameters and Voltage Deviation

The allowable operating voltage error shall not exceed 1.1 times its rated value; beyond this range, the power supply quality should be checked. The heating element is a stainless steel tubular structure; insulation resistance and withstand voltage should be re-verified against factory inspection records, and cold-state insulation should be re-measured with instruments before commissioning.

Layout Points for Oil Tank Applications

When used for oil tank heat tracing, the temperature near the oil outlet is relatively high; the heater layout should take into account the flowability of the discharged oil product and avoid local overheating that could cause medium deterioration. The temperature control element measuring point should preferably be close to the oil outlet area and maintain a reasonable distance from the heating section.

O&M Inspection Checklist

Regularly check the flameproof surfaces for corrosion and the sealing rings for aging; measure the operating current and three-phase balance; record the housing temperature and compare it with the T4 group limit; during shutdown maintenance, clean surface coking and dust accumulation, and verify fastener torque after reassembly.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us