Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

FJ-45 Flanged Electric Heating Tube

Published: 2026-10-15

产品价格:0.00

Views: 2922

Category: Electric Heating III

Product Description

Reactor jacket temperature failing to rise, high medium viscosity at the bottom of storage tanks, and pipe heat tracing sections feeling cold to the touch are several common problems in on-site operation and maintenance. During troubleshooting, first check whether the heating element terminal connections are loose and whether insulation has degraded, then confirm whether the element's power and immersion length match the working conditions. The FJ-45 flanged electric heating tube adopts a flange plate mounting method, with the electric heating elements centrally fixed on the flange plate, facilitating overall assembly and disassembly at reserved interfaces on tanks or pipes, and eliminating the need to drain the entire tank during maintenance.

Installation Interface and Immersion Dimensions

This model uses the flange plate as the positioning and sealing surface. During installation, use corresponding gaskets according to on-site flange specifications. Tighten bolts in a diagonal sequence in multiple passes to avoid deformation of the flange face caused by unilateral stress. The effective length immersed in oil is determined by the inner diameter of the tank or pipe. It is recommended to maintain appropriate spacing between the element end and the tank wall to prevent localized temperature concentration. Reliable insulation should be ensured between the element lead rods and the junction box. The junction box cover sealing ring should be replaced promptly once aged.

Electrical Parameters and Operating Conditions

The allowable working voltage error shall not exceed 1.1 times its rated value; exceeding this range will affect element lifespan. The design temperature is considered as 130°C, suitable for scenarios such as reactor jacket heating, storage tank insulation, pipe heat tracing, and small oil tank heating. When multiple elements are used simultaneously, it is recommended to distribute power evenly across each phase to reduce three-phase current imbalance. The control circuit can be combined with temperature sensors and contactors to achieve on-off regulation, avoiding long-term full-power operation.

Key Points for Operation and Maintenance Inspection

Routine inspections mainly focus on three items: whether terminal connections show heating and discoloration, whether there are leakage traces on the flange face, and whether there is scaling or carbon buildup on the element surface. Scaling impedes heat transfer, causing the element surface temperature to rise. Regular cleaning can be scheduled based on medium conditions. During shutdown periods, power should be disconnected and tagged. Before resuming use, measure insulation resistance before energizing. If multiple elements fail simultaneously, verify the actual operating voltage and medium liquid level to confirm whether low liquid level dry burning or excessively high voltage exists.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us