Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

Key Operation and Maintenance Issues for ZGR-95 Shell-and-Tube Heat Exchangers

Published: 2026-10-16

产品价格:0.00

Views: 2922

Category: 管壳式换热器

Product Description

During on-site operation and maintenance, shell-and-tube heat exchangers often experience outlet temperature fluctuations, increased pressure drop, or localized abnormal noise. The following key points are for troubleshooting and routine maintenance reference.

Point 1: Matching of Medium Temperature and Heating Power

When the medium temperature reaches the process setpoint, the control system adjusts the output power of the electric heater based on the temperature sensor signal through PID calculation, achieving temperature control of the resistive load of the heating element. If the outlet temperature remains low, verify whether the medium flow rate, inlet temperature, and heating power match. Note: deviations often occur under actual working conditions; after parameter confirmation, corrections should still be made based on operating data.

Point 2: Abnormal Pressure Difference Between Tube Side and Shell Side

Increased pressure difference is usually related to scaling, blockage, or valve opening. It is recommended to inspect the baffle plate channels and the attachments on the inner and outer walls of the heat exchange tubes. The cleaning cycle should be determined based on medium cleanliness and operating duration, and should not be fixedly extended.

Point 3: Leakage at Flanges and Nozzles

Leakage mostly occurs at locations where gaskets have aged or bolt pre-tightening force is uneven. After shutdown, check the sealing surface for scratches and re-tighten the bolts in a diagonal sequence. If the medium contains corrosive components, confirm the compatibility of the gasket material.

Point 4: Abnormal Noise and Vibration

Excessively high shell-side fluid velocity may cause tube bundle vibration and generate abnormal noise. Check whether the flow velocity is within a reasonable range, and if necessary, adjust the baffle spacing or add supports.

Point 5: Daily Inspection Records

Record the inlet and outlet temperatures, pressures, flow rates, and pressure difference trends. When parameters deviate from initial values, promptly analyze the causes to prevent minor issues from developing into shutdown failures.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us