Maintenance Points and Precautions for YBJ-95 Welded Plate Heat Exchangers

Published: 2026-10-17

产品价格:0.00

Views: 2922

Category: 压焊板换热器

Product Description

According to the relevant requirements of GB/T 151 and TSG 21, when a welded plate heat exchanger operates within a design pressure of 3.0 MPa and a design temperature range of -40°C to 200°C, the flow velocity in the plate channels shall be rechecked periodically. Maintenance work should establish records starting from the first month of commissioning. The following points are provided for reference by design selection and operation and maintenance personnel.

I. Review of Flow Velocity and Thermal Stress

In the cooling circuit of a chemical reactor, the temperature changes periodically, and excessively low flow velocity in the plate channels will aggravate thermal stress fatigue. It is recommended to calculate the minimum flow velocity during the selection stage, and after operation, recheck the deviation between the actual flow rate and the design value once every quarter. When the deviation exceeds 15%, the valve opening of the circuit should be adjusted or a bypass should be added.

II. Verification of Pressure and Temperature Boundaries

Welded plate heat exchangers use welding instead of gaskets, and their pressure and temperature resistance are limited by the plate material and welding process. During operation and maintenance, the readings of on-site pressure gauges and thermometers should be checked to ensure they do not exceed the range specified on the nameplate; under over-limit conditions, forced operation is not allowed, and whether to continue use should be decided only after shutdown and troubleshooting.

III. Cleaning Cycle and Standby Configuration

The cleaning cycle is determined according to the scaling tendency of the medium, and for conditions prone to scaling, it may be shortened to 3 to 6 months. After evaluating the impact of cleaning shutdown on production, decide whether to add standby equipment. Standby equipment should preferably be of the same model and parameters as the online equipment to facilitate interchangeability.

IV. Daily Inspection and Record Management

Inspection contents include leakage at connections, changes in pressure drop, and the integrity of the insulation layer. After each cleaning and maintenance, update the operation log, recording pressure drop, temperature difference, and cleaning method, so as to provide data support for the next cycle's maintenance plan.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us