Desktop|中文
Home About Us Products + News Center Technical Articles Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

SRY2-380V/1KW Tubular Electric Heater Application - Yangzhou Darui Electric Co., Ltd.

Published: 2020-05-13 09:18:56

Views: 2922

Category: Electric Heating IV

Product Description

SRY2-380V/1KW Tubular Electric Heater???Application


Used for heating oil in open or closed oil tanks, and for heating flowing or circulating oil. Therefore, this model heater has a high surface load and is only suitable for use in oil with good heat transfer effect.


SRY2-380V/1KW Tubular Electric Heater???Specifications and Technical Parameters:


1. Specifications and dimensions:








































































ModelVoltage (V)Power (KW)Dimensions and installation size (mm)
AB (immersion length in oil)Surface load (w/cm²)
SRY2-220(380)/1220V/380V1307230

2.9



SRY2-220(380)/2



220V/380V



2



507



430



3.1



SRY2-220(380)/3



220V/380V



3



707



630



3.2



SRY2-220(380)/4



220V/380V



4



922



845



3.1



SRY4-220(380)/5



220V/380V



5



697



620



5.3



SRY4-220(380)/6



220V/380V



6



807



730



5.5



SRY4-220(380)/8



220V/380V



8



1007



930



5.7



2. Working voltage tolerance: not greater than 1.1 times the rated value. The shell must be effectively grounded.


3. Working environment: relative humidity not greater than 95%, no explosive, flammable, or corrosive gases.


4. Metal tube material: 10# steel


5. Maximum working temperature: 100℃


6. Working pressure: <0.6MPa


7. Oil tank opening: ≥Ø65
 


After the equipment passes normal operation acceptance, our company will assign a professional engineer to provide on-site maintenance and operation training for your unit without personnel restrictions. The company organizes training twice a year. Training content includes: correct operation and use of the equipment; identification of primary faults and necessary recovery methods; common troubleshooting methods.


???Usage, Maintenance, and Precautions:


1. Dimension "B" in the outline drawing must be fully immersed in oil to avoid burning the component. The heated oil should be non-corrosive.


2. When melting solid oils such as asphalt and paraffin, reduce the voltage during use, and then increase to the rated voltage after melting to prevent heat concentration and reduce the service life of the component.


3. If carbon deposits are found on the tube surface, they must be removed before use to avoid reducing efficiency or even burning the component.


4. Store in a dry place. If the insulation resistance drops below 1MW due to long-term storage, dry in an oven at about 200℃ for several hours (or apply low voltage to the component for several hours) to restore insulation resistance.

 

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us