Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

Selection Guide for GFH-50 Finned Tube Heat Exchangers

Published: 2026-10-26

产品价格:0.00

Views: 2922

Category: 管翅式换热器

Product Description

Matching Tube Bundle and Fin Materials to On-Site Media

When the medium contains acidic or alkaline gases, carbon steel tube bundles and fins are at risk of pitting corrosion. Design and selection personnel should verify the medium composition, concentration, and dew point temperature, and determine the material combination for the tube bundle and fins accordingly. During the ordering stage, on-site operating conditions can be included in the technical agreement, making it easier to check the equipment nameplate parameters item by item upon arrival.

Structural Parameters and Installation Space Verification

The GFH-50 finned tube heat exchanger is designed and manufactured in accordance with relevant standards such as JB/T 4736. The finned tube arrangement, tube spacing, and face area affect heat transfer capacity and air resistance. During selection, the layout must be verified against the length, width, and height constraints of the installation location, maintenance access, and air inlet/outlet directions, with space reserved for maintenance.

Confirmation of Heat Transfer Area and Airflow Parameters

Determine the required heat transfer area based on heat load, inlet/outlet temperatures, and flow rate, and match it with the fan airflow. Selection personnel should compare design conditions with the equipment's nominal parameters item by item, and allow reasonable margin for operating conditions that deviate from the design point, avoiding long-term low-load or overload operation.

Key Points for Checking Control System Wiring

Before commissioning the control loop, if signal lights flash abnormally, first check whether the temperature sensor wiring is secure, then inspect the contactor contact status in the control loop. During the selection stage, the temperature measurement point locations and signal types should be clearly defined to facilitate on-site wiring and commissioning.

Maintenance Provisions for Corrosive Conditions

In corrosive environments, corrosion products tend to accumulate on the outer surface of the tube bundle and at the fin roots. During selection, accessibility for cleaning and inspection should be considered, and necessary inspection openings and drainage measures should be provided. Procurement personnel can use this to verify whether the on-site conditions are consistent with the equipment nameplate parameters.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us