Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

BR-70 Plate Heat Exchanger Maintenance and Precautions

Published: 2026-10-15

产品价格:0.00

Views: 2922

Category: 板式换热器

Product Description

During long-term operation of plate heat exchangers, aging of gaskets, plate fouling, and medium corrosion are common issues that procurement personnel need to pay attention to. Taking the BR-70 plate heat exchanger as an example, its herringbone corrugated plates enhance the heat transfer coefficient by increasing fluid turbulence, but the pressure drop is relatively high; horizontal straight corrugations are suitable for high-viscosity media or working conditions where a smaller pressure drop is allowed. Before procurement, the complete composition, concentration, operating temperature, and whether the medium contains particulate matter should be verified, and based on this, the plate material (such as 304, 316L, titanium) and gasket material (such as nitrile, EPDM, fluororubber) should be selected.

1. How to Estimate When Hot-Side and Cold-Side Parameters Are Incomplete

During the selection stage, technical engineers often encounter situations where only the hot-side inlet temperature and flow rate are provided on site, while the cold-side outlet temperature is undetermined. In this case, the cold-side flow rate can be estimated according to the heat balance equation, or the required heat exchange area can be preliminarily calculated based on empirical heat transfer coefficient ranges, but a margin of 10% to 20% should be reserved. During maintenance, if the actual heat exchange capacity is found to be insufficient, the degree of plate fouling and whether the gaskets have internal leakage should be checked.

2. Key Points for Daily Maintenance

Regularly check the inlet and outlet pressure difference. An increase in pressure difference usually indicates blockage or fouling of the channels between plates. Avoid using wire brushes during cleaning to prevent scratching the passivation film on the plate surface. When disassembling and assembling the plate pack, the clamping bolts should be tightened evenly in a diagonal sequence to prevent gasket misalignment. For long-term shutdown, the medium should be drained to avoid chloride ion corrosion.

3. Procurement Precautions

Procurement personnel should require suppliers to provide plate material certificates and temperature and pressure resistance parameters for gaskets. For media containing particulate matter, it is recommended to install a filter at the front end. When replacing gaskets, it is necessary to confirm that they match the original plate grooves.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us